SFO PMSS for SFO Grand Hyatt Hotel

The 351-room, 12-story hotel on airport grounds (next to the international terminal) should open in July 2019. The $237 million project, which broke ground in 2016 is now clearly visible from Highway 101. The hotel will offer more than 14,000 square feet of meeting space, a 70-seat three-meal restaurant, two bars, 24-hour in-room dining, a grab-and-go market, Hyatt StayFit Gym, yoga room and massage treatment room.

Scope of Work:

Concrete Sampling and Testing, Soil Compaction Inspection, AC Compaction, Reinforcing Steel, Field Welding, Rebar Sampling, Rebar Tensile and Bend Testing, Grout Sampling and Testing, Mix Design Reviews, Pre-Post Tensioning Tendon, Field and Shop Welding Inspection, Schmidt Hammer Testing, Torque Testing, Firestopping Inspections, Epoxy Observation, Coating Inspection, Soils Testing.